Figure 68 provides a map extract of the planned trial aquaculture plots with superimposed vessel track plots which were achieved within the North Hoyle OWF trial. Although Deepdock Ltd. had committed to not bringing their vessel to within 100m of turbines (twice the safety distance) trial operations were planned for plot areas within which an even smaller target box was allocated. The vessel tracks highlight the manoeuvrability of the dredge vessel Mare Gratia allowing it to effectively stay within the target zone.