In working with industry to resolve FUS Testing nonconformances, the goal is to have the nonconformance addressed within a worst case 90 day window from the date of the letter documenting the nonconformance of the Regular sample. This 90 day window assumes that both Special and Hold Lot samples are subsequently needed. UL believes that obtaining these samples within this timeframe is a reasonable manufacturing request.