Boiler needs to be turned on during late fall through winter season, to maintain the humidity and temperature control in clean room. Steam from heated coil exchanges the heat with air and provide 50% humidity air to clean room at drew point.
Based on the trial of the Boiler operation, facility team found the steam leakage from MAU pre-heat coil as show below.